AI agent teams: leading a project when most of the team is software
When specialist agents write the specs, the code and the tests, the project manager's job does not disappear. It moves to role design, handoff contracts, gates and a short list of decisions only a person may take. What the record of one platform and forty years of automation research say about doing it well.
Key takeaways
- AI agent teams need sharper role boundaries than human teams, because an agent will do whatever falls inside its instructions and nothing that falls outside them.
- Handoffs should be written contracts with a named receiver and a definition of done; review gates should be automated checks an agent cannot argue past.
- Every irreversible step, from launch to budget to medical or legal sign-off, belongs to a named person, and that list should be written down before the first task is assigned.
- Automation research predicts the two failure modes to watch: over-trusting agent output (misuse) and quietly routing around it (disuse); studies of multi-agent systems built on large language models find many failures in system design and task verification.
Most writing about AI agent teams is about orchestration: which agent calls which, how context is passed, how tools are wired. That is the engineering half. The management half gets less attention and fails more quietly. When a team of specialist agents plans, specifies, builds, tests and markets a product, somebody still has to decide what the team is for, who owns each artefact, what counts as done, and which decisions no agent may take. Those are project-management questions, and the standards bodies have started to answer them in general terms[2][3]. This article answers them in specific terms, using the record of how ESPAD AI is built and run.
ESPAD AI is the AI centre of ESPADLAND. Yaser Tayefeh's site names him as Founder and CEO of ESPADLAND and describes ESPADLAND as "a global business ecosystem spanning multiple ventures across technology, AI, digital commerce, travel, healthcare, media, and creative industries"[1]. According to ESPAD AI's own project record, Tayefeh leads the ESPAD AI project. Its eight specialist AI models (Sefaro, Ziba, Doki, Miras, Moj, Giti, Zarin and Shik) are being built on one platform described on the About ESPAD AI page; not all are open to users, and Shik, the occasion planner, is built but not yet public. Much of the delivery work behind them is done by a team of 14 specialist AI agents, with Tayefeh setting direction and approving anything that cannot be undone. The case is an illustration of the research below, not evidence that this way of working outperforms others. This piece sits in our AI project management topic, alongside the pillar guide to AI project management.
What actually changes when the team is mostly agents
Three things change, and one does not.
First, scope boundaries become literal. A human engineer who notices a broken translation on a page they did not touch will usually mention it. An agent will mention it only if noticing and reporting are part of its instructions. Role design therefore carries more weight than in a human team: gaps between roles become gaps in the product.
Second, throughput stops being the constraint. Agents can produce specs, code and copy faster than any person can review them. The bottleneck moves to review, integration and the decisions reserved for people. A plan that assumes the old bottleneck will schedule the wrong things.
Third, accountability cannot be delegated with the work. The NIST AI Risk Management Framework asks organisations to document roles, responsibilities and lines of communication for managing AI risk so that they are clear to everyone involved, and to define and differentiate roles for human-AI configurations and the oversight of AI systems[2]. ISO/IEC 42001 sets requirements for an organisation's AI management system as a whole, including leadership commitment and assigned responsibilities[3]. Neither framework imagines an agent being accountable. An agent can be responsible for a task; a person answers for the outcome.
What does not change is the core of the discipline. ISO 21502 frames project management around governance, defined roles, planning, control and benefits, and none of that becomes optional because the workers are software[4].
Role design: one owner for every artefact
The ESPAD AI team is organised in three groups. The table summarises what each agent owns, as recorded in the project's team charter.
| Group | Agent role | Owns |
|---|---|---|
| Build | Lead | Plans, priorities, task assignment, weekly report |
| Build | Product and UX | User flows, specs, screens, acceptance criteria |
| Build | Backend | API, data, migrations, jobs, services |
| Build | Frontend | Pages, components, brand themes, right-to-left layout, mobile |
| Build | Data integrations | Brand data imports, payments, email, CRM, webhooks |
| Build | AI architect | Prompts, retrieval, cost limits, answer evaluation |
| Build | Brand knowledge | Knowledge and voice of each brand assistant |
| Quality | QA | Tests and browser checks; the gate before merge |
| Quality | Security and compliance | Security, privacy, health and marketing claims |
| Quality | DevOps | Deploy workflow, servers, monitoring, running cost |
| Growth | Growth analytics | Tracking plan, dashboards, experiments |
| Growth | Marketing | Campaigns, social, email, launches |
| Growth | Sales ops and content | Representative content packs, scripts, lead flow |
| Growth | SEO and visibility | Search visibility, including in AI assistants |
Two design choices are worth copying. Each artefact has exactly one owner: the spec belongs to Product and UX, the merge gate to QA, the deploy to DevOps. And the Quality group is separate from the Build group, so the agent that writes code is never the agent that approves it. That is the same separation of duties a mature engineering organisation applies to people, and it matters more with agents, because an agent reviewing its own output tends to share the blind spots that produced it.
Handoffs written as contracts
In a human team, a lot of coordination happens in conversation. In AI agent teams it has to be written, because each agent starts from its instructions and the artefacts it is handed. The ESPAD AI workflow is a fixed sequence:
- The owner gives a goal; the Lead agent writes a short plan and assigns tasks.
- Product and UX writes the spec: flow, screens, copy and acceptance criteria.
- The Build agents implement it in a small pull request.
- QA reviews every pull request; Security and compliance also reviews anything touching personal data, health, payments or claims.
- A merge to the main branch runs the tests and then deploys automatically, and DevOps watches the deploy.
- Growth analytics measures the result; Marketing, Sales ops and SEO take it to users.
- The Lead agent reports to the owner every week.
The pattern behind the list is that every handoff names its receiver and carries a definition of done. The pilot plan for November 2026 shows it at task level: each row has an owner and a "done when" column, such as "works on staging in every language; eval set of 20 profiles passes". A task without a testable "done when" is a task an agent can declare finished on its own terms.
Review gates an agent cannot argue past
A gate that depends on persuasion is weak against a system that writes fluent justifications. The strongest gates in the ESPAD AI record are mechanical. Every push to the main branch runs the full test suite, about 5,500 tests, before anything deploys; a failure stops the release. After each deploy a separate check tests the live site. Another workflow checks every page in every language edition of the site, and tests block a release that leaves a page untranslated. A link checker verifies every source cited in this Journal.
The pilot gate shows the same logic at programme level. Each criterion was written as a measurable line with a target and a flag for whether it blocks "go". When the owner chose a simulated pilot instead of real testers, the plan stated what the simulation could stand in for and what it could not: it never replaces AI error lines, budget lines, evaluation sets or any safety line. Gates were defined before the evidence arrived, which is what keeps them honest. The limit should be stated as plainly: the first go decisions, for two brands in November 2026, rested on that simulation of 40 scripted users with stubbed AI responses, not on real users, so a pilot with real users remains the next gate.
An agent can be responsible for a task; only a person can answer for the outcome.
The human line: irreversible steps
The single most useful document in an agent-run project is the list of decisions no agent may take. ESPAD AI's list is short and specific:
- The owner: direction, budget, publishing, launch and production configuration changes.
- A partner doctor: medical content for the health brand.
- A lawyer: the token programme, securities questions and contracts.
- The shipping partner: physical orders.
The principle is reversibility. Agents may do anything that a later commit can undo; a person signs anything that cannot be cleanly reversed, or that carries professional liability. The record also shows how a leader keeps this line from becoming a bottleneck. In November 2026 the owner told the team to close open questions with sensible defaults; seventeen items were closed that way, while the items that genuinely needed the owner, the lawyer or the doctor stayed open and were labelled as waiting for approval. Delegating the reversible and holding the irreversible is how a leader stays in control without becoming the queue. New brands followed the same rule: they ship behind on/off feature flags, and only three brands went to the first pilot, so a launch decision can be taken back by switching a flag off.
Accountability in AI agent teams: a RACI with people in the A column
A responsibility-assignment matrix (RACI: responsible, accountable, consulted, informed) is an old tool that becomes newly useful here. The rule we apply is simple: agents may appear as R, C or I, but every A is a person. The matrix below is our illustration built from the ESPAD AI charter, not a document the project publishes.
| Decision or artefact | Responsible | Accountable | Consulted | Informed |
|---|---|---|---|---|
| Feature spec | Product and UX agent | Owner | Lead, QA | Build agents |
| Code change merged | Build agent | Owner, through the merge rules | QA, Security and compliance | DevOps |
| Production deploy | DevOps agent | Owner | QA | All agents |
| Health content released | Brand knowledge agent | Partner doctor | Security and compliance | Owner |
| Public launch of a brand | Lead agent | Owner | Growth agents | All agents |
Writing the A column forces the questions that matter: who would explain this decision to a regulator, a customer or a court? If the honest answer is "the agent", the process is not finished. This is the practical reading of the NIST requirement to differentiate roles in human-AI configurations[2].
What automation research warns about
None of this is new to human-factors researchers. Parasuraman and Riley distinguished four ways people relate to automation: use; misuse, which is over-reliance, including failures to monitor; disuse, which is neglect or under-use; and abuse, which is automating functions without due regard for the consequences for human performance[5]. All four appear in AI agent teams. Misuse is the reviewer who approves an agent's pull request because the last fifty were fine. Disuse is the team that quietly redoes agent output by hand and never fixes the agent's instructions. Abuse is the plan that automates review itself without asking who will still understand the system.
Parasuraman, Sheridan and Wickens added a useful map: automation can be applied to information acquisition, information analysis, decision and action selection, and action implementation, each at a different level[6]. For an agent team this suggests an explicit policy per stage. Letting agents gather and analyse at a high level of automation is very different from letting them select and carry out actions, which is where the irreversible-steps list applies.
Research on multi-agent systems built from large language models points to the same levers. Cemri and colleagues analysed more than 1,600 annotated execution traces from seven popular multi-agent frameworks and identified 14 failure modes in three categories: system design issues, inter-agent misalignment and task verification, with high agreement between expert annotators (kappa = 0.88)[9]. They also note that the performance gains of such systems on popular benchmarks are often minimal[9]. In project terms, the three categories correspond to role definition, handoffs between roles and checks before work is accepted, the same areas a team charter, handoff contracts and mechanical gates are meant to cover.
Bainbridge's "ironies of automation" explain why the human line is harder to hold than it looks: the more a system automates, the more the remaining human tasks are the rare, difficult ones, and the less practice people get at them[7]. A project owner who only ever sees summaries will be poorly placed to judge the one decision that matters. And Lee and See argue that the goal is not more trust but calibrated trust, reliance that matches what the automation can actually do[8]. In practice that means sampling agent work in depth from time to time, and tracking where agents were overruled, so that trust follows evidence. Delivery measures add a check on the team as a whole: in DORA's 2025 survey, AI adoption showed a positive relationship with software delivery throughput but continued to have a negative relationship with delivery stability[10], so a team that adds agents should watch stability, not only speed. The DORA research programme publishes those measures, and our cluster on software delivery metrics covers them.
Direction-setting as the leader's core job
What does leadership look like when most of the team is software? The ESPAD AI record suggests it is mostly a set of decisions about structure. On this project those decisions were: rebuilding the platform on a modern stack while the old app stayed live as the reference until the new one reached parity; a pilot-first rollout of three brands behind flags; every page in every language the site offers, by default, with tests that block an untranslated release; a cost limit on every model call; and an agent team whose authority ends exactly where reversibility ends. None of these is novel; each follows from the standards and research cited above. The same approach to choosing what to build first is the subject of our piece on AI portfolio management.
The same consent principle is designed into the product. In Shik, the occasion planner, which is built but not yet public, a person ticks which assistants may contribute to a plan, and an assistant that was not ticked adds nothing. The platform's commitments on AI use are set out on the AI policy page.
Starting points for a programme director
- Write the team charter first: one owner per artefact, and a Quality group separate from Build.
- Give every task a testable "done when", and every handoff a named receiver.
- Make gates mechanical wherever possible, and define them before the evidence arrives.
- Publish the list of irreversible decisions and who signs each; delegate everything else with defaults.
- Fill the A column of the RACI with people only.
- Sample agent output in depth regularly, and record where people overruled agents, to keep trust calibrated.
The NIST AI RMF and the original Parasuraman and Riley paper are both worth reading in full before you design your own version.
Frequently asked questions
Can an AI agent be accountable for a project decision?
No. An agent can be responsible for carrying out a task, but accountability means answering for the outcome to customers, regulators or a board, and only a person can do that. The NIST AI RMF asks organisations to define and differentiate roles in human-AI configurations. A practical rule is that agents may appear as responsible, consulted or informed in a RACI matrix, but every accountable entry is a named person.
Which decisions should never be delegated to AI agent teams?
Anything that cannot be cleanly undone or that carries professional liability: launches, budgets, production configuration, contracts, and medical or legal sign-off. Write the list down before assigning the first task and name the person who signs each item. Everything reversible can be delegated, ideally with sensible defaults so the leader does not become a queue.
How do you stop reviewers from rubber-stamping agent output?
Make the main gates mechanical, such as a full test suite that must pass before any deploy, so approval does not rest on a reviewer's attention alone. Then sample agent work in depth at intervals and track where people overruled agents. This follows the human-factors finding that trust should be calibrated to what automation can actually do, not simply increased.
Should the agent that writes code also review it?
It should not. Separate the agents that build from those that approve, as ESPAD AI does with distinct Build and Quality groups. An agent reviewing its own output tends to share the blind spots that produced it, which is the same reason human teams separate authoring from approval. The reviewing agent should also work from written acceptance criteria rather than the author's explanation.
Do project-management standards apply to AI agent teams?
Yes. ISO 21502 frames project management around governance, defined roles, planning and control, and none of that becomes optional when the workers are software. ISO/IEC 42001 adds requirements for an AI management system at organisation level. Agent teams change where the bottleneck sits, moving it from production to review and decisions, but not the need for governance.
References
- Tayefeh, Y. (n.d.). Yaser Tayefeh: Founder & CEO of ESPADLAND. Retrieved November 24, 2026. yasertayefeh.com
- National Institute of Standards and Technology. (2023). Artificial intelligence risk management framework (AI RMF 1.0) (NIST AI 100-1). U.S. Department of Commerce. doi.org/10.6028/NIST.AI.100-1
- International Organization for Standardization & International Electrotechnical Commission. (2023). Information technology: Artificial intelligence: Management system (ISO/IEC 42001:2023). www.iso.org/standard/42001
- International Organization for Standardization. (2020). Project, programme and portfolio management: Guidance on project management (ISO 21502:2020). www.iso.org/standard/74947.html
- Parasuraman, R., & Riley, V. (1997). Humans and automation: Use, misuse, disuse, abuse. Human Factors, 39(2), 230-253. doi.org/10.1518/001872097778543886
- Parasuraman, R., Sheridan, T. B., & Wickens, C. D. (2000). A model for types and levels of human interaction with automation. IEEE Transactions on Systems, Man, and Cybernetics, Part A: Systems and Humans, 30(3), 286-297. doi.org/10.1109/3468.844354
- Bainbridge, L. (1983). Ironies of automation. Automatica, 19(6), 775-779. doi.org/10.1016/0005-1098(83)90046-8
- Lee, J. D., & See, K. A. (2004). Trust in automation: Designing for appropriate reliance. Human Factors, 46(1), 50-80. doi.org/10.1518/hfes.46.1.50_30392
- Cemri, M., Pan, M. Z., Yang, S., Agrawal, L. A., Chopra, B., Tiwari, R., Keutzer, K., Parameswaran, A., Klein, D., Ramchandran, K., Zaharia, M., Gonzalez, J. E., & Stoica, I. (2025). Why do multi-agent LLM systems fail? arXiv:2503.13657. arxiv.org/abs/2503.13657
- Harvey, N., & DeBellis, D. (2025, September 23). Announcing the 2025 DORA report: State of AI-assisted software development. Google Cloud Blog. cloud.google.com/blog/products/ai-machine-learning/announcing-the-2025-dora-report